Year: 1960
Type: report
Abstract: High tank line cleaning and low flow tests at B, D, F, and H Reactors have been completed and results analyzed and related to high tank backup support. Interim provisions have been completed at the old reactors for bleeding and temperature measurement of high tank cooling water. This letter supplies a recommended guide for maintaining high tank temperature control.
DOI: 10.2172/10154638
Language: English
Subfield: Nuclear Energy and Engineering
Field: Energy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W1978766048
