Tank waste remediation system configuration management implementation plan
Year: 1998
Type: report
Abstract: The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.
DOI: 10.2172/10148114
Authors: J Vann, USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W1985273447