Year: 2008
Type: article
Abstract: IPP Garching is heavily involved in the development of the rf driven H(-)/D(-) ion source for the ITER NBI. After the successful demonstration of the required physical parameters, the experimental conditions have been extended to long pulses and large area beam extraction. This paper contains descriptions of the source and power supply modifications necessitated for long pulses as well as the latest results including the first 1 h pulse. Suppression of the coextracted electron current is a key issue. Experiments with potential control, different magnetic filter fields, and cesium handling to suppress the electrons and stabilize the currents are also reported.
Source: Review of Scientific Instruments
DOI: 10.1063/1.2804917
Institutions: Max Planck Institute for Plasma Physics, Max Planck Society
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W1992738245
