Year: 2014
Type: conference-paper
Abstract: This paper provides an overview of the system design, architecture, and construction phase system engineering processes of the Thirty Meter Telescope project. We summarize the key challenges and our solutions for managing TMT systems engineering during the construction phase. We provide an overview of system budgets, requirements and interfaces, and the management thereof. The requirements engineering processes, including verification and plans for collection of technical data and testing during the assembly and integration phases, are described. We present configuration, change control and technical review processes, covering all aspects of the system design including performance models, requirements, and CAD databases.
DOI: 10.1117/12.2056870
Institution: Jet Propulsion Laboratory
Language: English
Subfield: Control and Systems Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: bronze
Funders: National Science Foundation, Gordon and Betty Moore Foundation, California Institute of Technology, Association of Canadian Universities for Research in Astronomy, National Astronomical Observatory of Japan, Natural Sciences and Engineering Research Council of Canada, National Institutes of Natural Sciences, British Columbia Knowledge Development Fund, Ontario Ministry of Research and Innovation
OpenAlex ID: W1995249679
