Work

Proton beam therapy: reliability of the synchrocyclotron at the Harvard Cyclotron Laboratory

Year: 1991
Type: article
Abstract: The synchrocyclotron at HCL has been operating for more than 40 years with a variable work load and different maintenance schedules. The analysis of the downtime over the past 10 years has shown that, on the whole, the cyclotron has operated very reliably with most breakdowns being quickly corrected. Regularly scheduled maintenance periods and the replacement of some of the older components and subsystems should ensure even less downtime in the next few years. Despite all preventive measures, the potential always exists for catastrophic failure of a major component, which may result in a long downtime while a solution is sought or a replacement part is located. This has happened only twice in the last 10 years, so that perhaps five years might be considered a typical time to major breakdown. The average downtime over the past 10 years was 2.3% of regularly scheduled patient treatment hours.
Institution: Harvard University
Language: English
Open Access status: bronze
OpenAlex ID: W2003708201
FWCI:
Cites: 8
Cited by: 5
Related to: 10