Year: 1957
Type: report
Abstract: Equipment required to provide production capacity of 525 tons per month of I & E fuel elements ``O,`` ``C,`` and ``K`` sizes in the 313 Building is specified in this document.
DOI: 10.2172/10117181
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2007274864
