Bridge management system development for a cable-stayed bridge
Year: 2001
Type: article
Abstract: The exclusive bridge management system for a special type of bridge, Seo-Hae Bridge, which is the largest cable-stayed type in this country, has been successfully developed and operated in bridge field. Bridge Management System (BMS) is generally classified into two categories based on its application: the global-purpose and exclusive type. The global-type is applied to overall bridge group in the road networks under a managing authority, while the exclusive type is for a specific single bridge. Since two types of system have different application field the system development strategy should also be different in its purpose and contents. The contents of Seo-Hae Bridge Management System (SHBMS) which is the first exclusive type system for a specific bridge is introduced in this paper.
DOI: 10.1007/bf02830725
Author: Sungkon Kim
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
Estimated APC paid: $1,800
OpenAlex ID: W2012397401
