Year: 1971
Type: article
Abstract: We decided to study silt scouring because power station cooling water may be drawn into the intake through an open channel or through a tunnel; a channel is cheaper to build but may suffer from siltation and so may need dredging, which can be very costly.Clearly, a better understanding of the siltation process could lead to significant savings in the cost of future stations.
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Keywords: siltation, dredging costs, sediment transport
Open Access status: bronze
OpenAlex ID: W2013579477