Verification of maximum radial power peaking factor due to insertion of FPM-LEU target in the core of RSG-GAS reactor
Year: 2014
Type: conference-paper
Source: AIP conference proceedings
DOI: 10.1063/1.4895864
Authors: Daddy Setyawan, Budi Rohman
Institution: Badan Pengawas Tenaga Nuklir
Language: English
Subfield: Nuclear Energy and Engineering
Field: Energy
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W2015537751
