On the polyhedral structure of a multi-item production planning model with setup times
Work
Year: 2003
Type: article
Source: Mathematical Programming
Cites: 18
Cited by: 46
Related to: 10
FWCI: 8.795
Citation percentile (by year/subfield): 93.91
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed