Construction Schedules Simulation and Prediction of Water Conveyance Tunnel Based on Karst Geological Condition
Year: 2012
Type: article
Abstract: The construction process of water conveyance tunnel is complex and stochastic under the karst geological condition. Aiming at analyzing the construction process under this special condition, a simulation modeling method of water conveyance tunnel construction is presented. Through demonstrating the simulation analysis and predicting the schedules in a real case study of a water conveyance tunnel, this method is proved advanced and intuitive for formulating and analyzing the construction schedules under the karst geological condition.
Source: Advanced materials research
Authors: Lei Bi, Jia Qian Luo, Da Wei Tong
Institutions: Tianjin University, Norsk Hydro (Germany)
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: hybrid
OpenAlex ID: W2070530882
