A two-stage heuristic for disassembly scheduling with assembly product structure
Work
Year: 2004
Type: article
Authors Dong-Ho Lee, Paul Xirouchakis
Cites: 19
Cited by: 64
Related to: 10
FWCI: 8.314
Citation percentile (by year/subfield): 98.96
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Sustainable Development Goal Responsible consumption and production
Open Access status: closed