Work

Application of GM (1, N) Model on Slope Stability Analysis in Open Pit Mine

Year: 2011
Type: article
Abstract: The paper analyzed major factors that influence the stability of open-pit slope and established the GM (1, N) model based on the program of Xingshan strip mine, which provided an effective method for evaluating the slope stability.
Language: English
Open Access status: hybrid
OpenAlex ID: W2145167246
FWCI:
Cites:
Cited by: 2
Related to: 10