Test instances for the flexible job shop scheduling problem with work centers
Year: 2012
Type: article
Abstract: The flexible job shop scheduling problem (FJSSP) is a generalization and extension of the classical job shop scheduling problem (JSSP) in which — prior to the sequencing of operations — an assignment of operations to machines is necessary. In this technical report, we are examining common instances for different specifications of the FJSSP. Furthermore, a new FJSSP specification is introduced, where similar machines are pooled to work centers, and the first and last work center are obligatory. For this practice-oriented problem specification new test instances are presented.
Source: OpenHSU
DOI: 10.24405/436
Authors: Behnke, Dennis, Geiger, Martin Josef
Institution: Helmut Schmidt University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W21655972
