Work

Test and Evaluation Plan for Waste Feed Delivery Project W-521

Year: 2000
Type: report
Abstract: The purpose of this Test and Evaluation Plan (TEP) is to identify the Test and Evaluation (T&E) activities required to confirm that design and installation of systems, structures, and components (SSCs) provided by Project W-521 will satisfy Level 2 and operational requirements, and to describe the T&E program to be implemented during the various project phases. This TEP establishes a sequence of test and evaluation activities to provide confidence that all required T&E activities will be accomplished successfully to support a smooth and timely turnover of completed SSCs to the River Protection Project (RPP) operations organization. In addition, organizational responsibilities for managing and performing the T&E activities are outlined. This TEP was prepared in accordance with the guidance and requirements of the RPP Test and Evaluation Management Plan. The Project W-521 TEP documents the process that will show that the SSCs are (1) compliant with the requirements of the Level 2 Specifications, (2) constructed in accordance with approved design drawings and procurement/construction specifications, (3) installed properly and appropriately integrated into the existing systems, and (4) will operate adequately on turnover to the customer.
Author: T.H. MAY
Language: English
Open Access status: green
OpenAlex ID: W2200636262
Cites:
Cited by:
Related to: 10