A Comparison of Heuristics for Scheduling Problems in Textile Industry
Year: 2016
Type: article
Abstract: Scheduling is an important problem in textile industry. The scheduling problem in textile industry generally belongs to the flow shop scheduling problem (FSSP). There are many heuristics for solving this problem. Eight heuristics, namely FCFS, Gupta, Palmer, NEH, CDS, Dannenbring, Pour, and MOD are considered and compared. Experimental results show the best heuristic is NEH and the worst heuristic is FCFS.
Source: Jurnal Teknologi
DOI: 10.11113/jt.v78.9034
Authors: Cecilia E. Nugraheni, Luciana Abednego
Institution: Parahyangan Catholic University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2425503446
