Work

BESIII ETOF upgrade readout electronics commissioning

Year: 2017
Type: article
Abstract: It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with a multi-gap resistive plate chamber (MRPC), aiming at an overall time resolution of about 80 ps. After completing the entire readout electronics system, some experiments, such as heat radiation, radiation hardness and large-current beam tests, have been carried out to confirm the reliability and stability of the readout electronics. An on-detector test of the readout electronics has also been performed with the beam at the BEPCII E3 line. The test results indicate that the readout electronics system fulfills its design requirements.
Language: English
Open Access status: green
OpenAlex ID: W2575983292
FWCI: 0.859
Cites: 11
Cited by: 8
Related to: 10