Year: 2017
Type: conference-paper
Abstract: The paper is discussed the possible ways for development the heavy haul train service on the Baikal-Amur mainline. Urgent need for new technologies is caused by the growth in cargo flows to the Pacific seaports. Current measures of Russian Railways and Russian Government for increase the capacity of this key section are too late and don’t provide guarantee for reaching the target capacity level. Authors are trying to find the solution by implementing the heavy haul trains technology to pass growing cargo volumes.
Source: Procedia Engineering
Institution: Far Eastern State Transport University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2612484875
