Integration of commodity price uncertainty in long-term open pit mine production planning by using an imperialist competitive algorithm
Year: 2018
Type: article
Abstract: Production planning for open pit mines is a complex and significant problem that has been investigated by many researchers.The planning process usually starts with the construction of a geological block model, which comprises the set of imaginary regular blocks that covers the ore deposit and surrounding host rock.A set of attributes such as grade, specific gravity, and coordinate is then assigned to or estimated for each of these blocks using drill-hole sample data.Geological attributes are combined with technical and economic parameters in the next stage to determine the monetary value of each block and construct the economic block model, which provides the basic input for the production planning problem.Generally, production planning for an open pit mine entails finding the sequence of blocks for the optimal annual schedules in a way that leads to the highest net present value (NPV) of the project cash flows, while meeting the technical constraints such as mining capacity, processing capacity, sequencing, and pit slope (Dagdelen, 2001).Long-term production planning could be categorized into two major classes, of deterministic and stochastic-based approaches.Deterministic open pit production planning has been studied since 1968 (Johnson, 1968) and, conventionally, several methodologies have been developed, such as integer programming (Caccetta and Hill, 2003;Dagdelen and Johnson, 1986), mixed integer programming (Boland et al., 2009;Elkington and Durham, 2011), dynamic programming (Wang and Sevim, 1992), and meta-heuristic approaches such as the genetic algorithm (Denby and Schofield, 1994), particle swarm algorithm (Khan and Niemann-Delius, 2014), and ant colony algorithm (Sattarvand and Niemann-Delius, 2009;Shishvan and Sattarvand, 2015).The fundamental and significant drawback of these approaches is the assumptions about input parameters.Assuming exactly known (deterministic) parameters, unlike reality in which a significant degree of uncertainty is associated with these parameters, may lead to unrealistic and incorrect production planning (Abdel Sabour and Poulin, 2010;Dimitrakopoulos, Farrelly, and Godoy, 2002;Marcotte and Caron, 2013).Unlike the conventional deterministic mine design process, which is usually implemented based on deterministic input parameters, stochastic planning of open pit mines considers uncertainty in input parameters.This approach has attracted research during the last decade and several methods have been developed, which can be divided into three main categories: mathematical-based, heuristic, and meta-heuristic approaches.Mathematical formulations using linear programming (Dimitrakopoulos, Farrelly, and Godoy, 2002), integer linear programming (
Authors: M. Mokhtarian Asl, J. Sattarvand
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2805895409