Economic Sizing of a Grid-Connected Photovoltaic System: Case of GISER research project in Morocco

Year: 2018
Type: conference-paper
Abstract: This paper is within the framework of the GISER (Gestion Intelligent des Systèmes d'Energies Renouvelables). It's a project about 3kVA hybrid energy management in PERE Laboratory (Procedés des Energies Renouvelables) of EST fez Morocco. We present a sizing study and a cost analysis of a photovoltaic system using simulation results with Sunny Design software. The goal of our work is to compute and optimize the dimensioning of a photovoltaic installation in order to find the best configuration of the system. We have considered a PV installation connected to the grid with 2.5kWp through an inverter. We have taken into account meteorological conditions in the installation site (radiation and temperature). Our optimization approach considers the operation of each part of the installation, including energy production, energy consumption and the overall quality/price of the installation.
Language: English
Field: Energy
Open Access status: diamond
OpenAlex ID: W2807900299
FWCI: 2.309
Cites: 13
Cited by: 4
Related to: 10