Work

Factored estimates for lignite commercial concepts. Interim report. Series No. IV: B-4

Year: 1978
Type: report
Abstract: The Joint Coal Gasification Program of the Department of Energy and the Gas Research Institute was organized to accelerate the development of new processes through the pilot plant stage for producing pipeline gas from coal. There are four processes in the program at various stages of development. A comparison of these processes for the major coal types is included in the program. These coal types are eastern high sulfur, caking, bituminous coal, western low sulfur, non-caking, subbituminous coal, and low sulfur lignite. Comparisons for western and eastern coals are published separately. For various reasons, the comparison for lignite was first dropped from the program, then reinstated with the present limited scope. One of the reasons for this study is to properly treat the CO/sub 2/ Acceptor process. Though this process cannot readily be used for eastern coals, it has had reasonable pilot plant success on certain types of lignite. The conventional Lurgi process is used as the basis for comparison. The estimated cost of gas from the two processes was: $3.10/million Btu for the CO/sub 2/ acceptor process and $2.79 for the Lurgi process. The estimated capital cost of the Lurgi plant was about 11% greater. The methods and assumptionsmore » used in these calculations are described in detail.« less
Author: R. Detman
Language: English
Subfield: Fuel Technology
Field: Energy
Open Access status: green
OpenAlex ID: W3047696147
Cites:
Cited by:
Related to: 10