Work

333 Building preliminary survey potential equipment improvements

Year: 1962
Type: report
Abstract: In order to provide advance direction for 333 Building equipment development work, a survey of potential areas of significant savings through equipment improvement has been made. The purpose of this report is only to indicate areas for investigation, not to define a program. Equipment is adequate to maintain operating continuity and provide for safe operation of the building. Special attention should be given to ``one-of-a-kind`` pieces of equipment. These include the press, cutoff saw, beta heat treat facility and autoradiograph film developer. Manpower savings will result principally from refinement of each operation. There are no really outstanding areas for improvement. The greatest potential for savings is in material costs. These are illustrated in Tables I&IV. Maintenance costs provide for possible significant reductions at braze, vacu-blast, nondestructive test, autoclaves, and chemical processing equipment.
Language: English
Open Access status: gold
OpenAlex ID: W3131224
Cites:
Cited by:
Related to: 10