Work

Program for documenting the criticality safety basis for operations in a research and development facility consistent with new regulatory requirements

Year: 1997
Type: conference-paper
Abstract: A program was developed and implemented at LLNL to provide more detailed, documented Criticality Safety Evaluations of operations in an R&D facility. The new Criticality Safety evaluations were consistent with regulatory requirements of the then new DOE Order 5480.24, Nuclear Criticality Safety. The evaluations provide a criticality safety basis for each operation in the facility in support of the facility Safety Analysis Report. This implementation program provided a transition from one method of conducting and documenting Criticality Safety Evaluations to a new method consistent with new regulatory requirements. The program also allowed continued safe operation of the facility while the new implementation level Criticality Safety Evaluations were developed.
Language: English
Open Access status: green
OpenAlex ID: W320791932
FWCI:
Cites:
Cited by:
Related to: 10