Work

Improved Miscible Nitrogen Flood Performance Utilizing Advanced Reservoir Characterization and Horizontal Laterals in a Class I Reservoir--East Binger (Marchand) Unit

Year: 2005
Type: report
Abstract: recent months, but this is still far below the 58% recycle prior to initiation of the project. Two additional wells--EBU 65-2 and EBU 67-2--were brought on line during this reporting period. EBU 65-2 was successfully sidetracked after encountering thin pay on the edge of the reservoir, and is awaiting conversion to nitrogen injection service. The early performance of EBU 67-2 has been as predicted.
Author: Joe Sinner
Language: English
Subfield: Fuel Technology
Field: Energy
Open Access status: green
OpenAlex ID: W4234523217
Cites:
Cited by:
Related to: 10