Work

Interim reliability evaluation program, Browns Ferry 1

Year: 1981
Type: article
Abstract: Probabilistic risk analysis techniques, i.e., event tree and fault tree analysis, were utilized to provide a risk assessment of the Browns Ferry Nuclear Plant Unit 1. Browns Ferry 1 is a General Electric boiling water reactor of the BWR 4 product line with a Mark 1 (drywell and torus) containment. Within the guidelines of the IREP Procedure and Schedule Guide, dominant accident sequences that contribute to public health and safety risks were identified and grouped according to release categories.
Language: English
Open Access status: green
OpenAlex ID: W42360766
FWCI:
Cites:
Cited by:
Related to: 10