Work

Magnetic Field Calculation for Fermilab Style Magnet Coil End

Year: 1982
Type: report
Abstract: device as the ramp is executed. The 1997 ramps consist of ramp tables for 100 devices. Appendix 1 gives a list of the devices ramped. Most of these devices will still require ramps for the next fixed target run. Future decelerations will also require ramps for the quadrupole magnet shunts that were installed as part of the {gamma}{sub t} upgrade. Additionally, ramps must be constructed for the two skew-sextupole magnets that will be installed during the summer of 1999.
Language: English
Open Access status: green
OpenAlex ID: W4239659334
Cites:
Cited by:
Related to: 10