Abstract: This Phase II final report contains a description of the hardware fabrication and initial test results of a 15-kW wind turbine. The system represents a growth version of the 8-kW wind system incorporates many improvements over its predecessor and these should improve producibility and reduce operating costs. A test program was successfully completed, including performance measurements, which demonstrated the operational and performance characteristics of the prototype. The unit has been shipped to Rockwell International, and the test program will continue at the Rocky Flats Test Center, near Boulder, Colorado.