Work

How to Reduce Downtime of Freight Cars Awaiting Loading?

Year: 2016
Type: article
Abstract: The process of ensuring car loading is much dependent on stochastic factors. The presence of such a dependence forces operators to create technological reserve at the point of loading operations. The authors considered the impact of fragmentation of freight rolling stock on the stock level and economic results of work, as well as opportunities to consolidate resource management under a single basis in order to increase productivity and profitability of the industry.
Language: English
Open Access status: hybrid
OpenAlex ID: W4312995403
FWCI: 0.314
Cites:
Cited by: 1
Related to: 10