Project W-320, WRSS PCP: Procedure implementation verification
Year: 1998
Type: report
Abstract: This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List.
DOI: 10.2172/345008
Authors: J Bailey, USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
Institutions: Richland School District Two, Santec Corporation (Japan)
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W52183147
