Analisa Produktivitas Pemancangan Tiang Menggunakan Alat Pancang Diesel Hammer Pada Proyek Pembangunan Gedung Kantor Pengadilan Agama Dataran Hunipopu
Year: 2025
Type: article
Abstract: The pile driving process is an important stage in foundation construction, which serves to ensure the stability and strength of the building structure. Piling can be done with various types of tools, one of which is a diesel hammer. Diesel Hammer is known for its ability to provide large impact energy on the pile, allowing the pile to penetrate the soil effectively and efficiently. The purpose of this research is to determine the cycle time of the piling process and determine the productivity of piling using diesel hammer tools. The method used in this research is direct observation to the field. The results obtained from the research are the average cycle time in the piling process using a diesel hammer piling tool at 101 points for 16 days is 50.35 minutes during normal working hours and 59.94 minutes during overtime. The productivity of the diesel hammer on the work of the Religious Court Office Building was the lowest on the first day with a productivity value of 10.48 m / hour and the highest occurred on day fifteen with a productivity value of 17.25 m / hour. While in overtime working hours the highest productivity occurred on the fifteenth day which amounted to 16.71 m / hour and the lowest on the first day which amounted to 4.01 m / hour. Keywords: Produktivity, Pilling, Diesel Hammer
Source: JURNAL SIMETRIK
Institution: Politeknik Negeri Ambon
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: diamond
OpenAlex ID: W7117874779