Year: 2026
Type: conference-paper
Abstract: This study discusses the feasibility study for the construction of a fiber trimaran fishing boat workshop atthe Surabaya State Shipping Polytechnic, using an approach that analyzes , Tecnical Relayout plan andfinance . Layout O was selected as the best design because it has the smallest track distance percentage at28.93%, thereby increasing material handling efficiency. From a financial perspective, this project showshigh feasibility with a Net Present Value (NPV) of IDR 357,371,998, a Payback Period of 0.70 years, anda Profitability Index (PI) of 6.45. These results indicate that the project can generate significant profits ina short and efficient timeframe
Institution: Politeknik Perkapalan Negeri Surabaya
Language: English
Subfield: Finance
Domain: Social Sciences
Open Access status: diamond
OpenAlex ID: W7154152161
