Work

Oregon Utility-Scale Battery Storage Inventory

Year: 2026
Type: dataset
Abstract: Inventory 1.4.6.1: “Adds Well Springs Solar BESS (Morrow County, proposed, 500 MW / 2,000 MWh) and Remington BESS (Marion County, proposed, 199 MW / 796 MWh). The inventory now holds 43 facilities, 9,282 MW and 38,807 MWh.” Facility-level inventory of Oregon utility-scale battery energy storage at 5 MW nameplate and above: 41 facilities totalling 8,583 MW and 36,011 MWh across four development stages — operating, under construction, approved, and proposed — through the 2031 pipeline. Records nameplate power and energy, chemistry, county, owner and developer, development stage and source for each facility, with summary views by category, by Portland metro location, and as statewide and metro time series. Compiled from Oregon Department of Energy and Energy Facility Siting Council project records, utility filings and developer disclosures. Companion to Appendix A of Battery-Electric Oregon: Design for Resilience and Values (https://doi.org/10.5281/zenodo.22072669).
Language: English
Field: Energy
Open Access status: green
OpenAlex ID: W7204114680
Cites:
Cited by:
Related to: 10