Work

Modifikasi Desain Fix Points Pada Mesin Building Alt E-2

Year: 2025
Type: article
Abstract: The increase in downtime on the ALT E2 building machine is caused by several problems that occur on the ALT E2 machine. This is because there are several ALT E2 building machine spare parts that are obsolete, the fix point mounts are not strong enough, and there is high damage to the ply service. This research aims to reduce downtime on the ALT E2 building machine. From the fishbone analysis carried out, the author made modifications to the ALT E2 machine by upgrading the Mitsubishi A2US series PLC to the Q03UDE series PLC to maintain the availability of spare parts for the obsolete ALT E2 building machine, redesigning the Fix points to make them sturdier, more precise and easier to use. Carrying out maintenance on the drum motor, as well as modifying the brake ply service by replacing the PVC hose with a copper pipe on the ALTE2 machine to reduce air leaks, so that the ply service can work optimally.
Language: Indonesian
Open Access status: diamond
OpenAlex ID: W7220046292
FWCI:
Cites:
Cited by:
Related to: 10