การกำหนดรอบการทำการบำรุงรักษาเชิงป้องกันและขนาดของสินค้ากันชนที่เหมาะสมภายใต้การล้าสมัยอย่างฉับพลันและการเกิดเครื่องจักรขัดข้อง
Year: 2026
Type: article
Abstract: In this work, a production unit subject to random breakdowns and periodic preventive maintenance (PM) is investigated. This production unit is used to produce input for the subsequent production stage. To ensure that the subsequent production stage has sufficient input, a certain amount of buffer amount of buffer stock is produced for use during breakdowns and PM. However, due to the rapid change of technology today, producing excessive buffer stocks increases the risk that those buffer stocks will suddenly become obsolete incurring obsolescence cost to the firm. Therefore, in this paper, we develop a mathematical model to determine the optimal PM period and the optimal size of buffer stock minimizing the total expected cost during the product lifetime. This cost includes inventory-related cost, maintenance cost, and obsolescence cost.
Institutions: Khon Kaen University, Srinakharinwirot University
Language: Thai
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
OpenAlex ID: W7220180975
