Year: 2026
Type: article
Abstract: Introduction. The investment and construction sector is characterized by a high complexity and variety of professional tasks, the effectiveness of which significantly depends on the compliance of the natural psychophysiological characteristics of employees with the requirements of the activity. The existing methods of personnel management in construction organizations do not sufficiently take this factor into account, which leads to a suboptimal distribution of functions, increased fatigue and reduced productivity. The relevance of the research is determined by the need to develop scientifically sound approaches to human resource management based on objective neurophysiological patterns of human activity organization. Materials and methods. The theoretical basis of the study is the bimodal classification of natural specializations (CNS-B), based on the principle of alternative paired regulation of activity. The methods of system analysis, structural and functional modelling, qualitative comparative analysis, the method of expert assessments and analytical modelling are used. The functional structure of the investment and construction project is analyzed, and the stages that impose specific requirements on the cognitive and regulatory characteristics of the performers are highlighted. Results. A matrix of correspondence has been developed between 16 integral natural specialties of CNS-B and professional roles in the investment and construction sector, including recommended activities, job positions and stages of the project cycle. The principles of forming effective project teams are formulated: functional completeness, regulatory compatibility, role matching and compensation. A conceptual model for managing the personnel potential of an organization is proposed, which includes blocks for diagnosing specializations, analyzing compliance, developing recommendations, and monitoring effectiveness. The economic efficiency of the proposed solutions is substantiated: increasing labour productivity, reducing staff turnover, and reducing project implementation time. Conclusions. The use of CNS-B in the personnel management of organizations in the investment and construction sector makes it possible to increase the efficiency of using human resources through a scientifically based distribution of functions, the formation of balanced project teams and the reduction of energy costs for employees. The results can be used by managers of construction organizations, HR specialists and project managers to optimize the personnel structure, increase labour productivity and prevent professional burnout. The directions of further research have been identified: empirical validation of the developed matrix, creation of diagnostic techniques and software to support personnel decisions.
Source: Vestnik MGSU
Author: Ишков Александр Дмитриевич
Language: Russian
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W7225207756
