Year: 2016
Type: article
Abstract: The objective of the paper is to present a way to shorten the time required to perform laboratory tests of materials in metallurgy. The paper finds a relation between the time to perform a test of materials and the number of technicians carrying out the test. The relation can be used to optimize the number of technicians. The approach is based on probability theory, as the amount of material to be tested is unknown in advance, and uses powerful modelling techniques involving the generalized estimating equations.
Authors: F. Tošenovský, D. Vykydal, P. Klaput, P. Halfarová
Institution: VSB - Technical University of Ostrava
Language: English
Subfield: Strategy and Management
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W2575291464
