An investigation into the performance of management contracts and the traditional methods of building procurement
Year: 1989
Type: dissertation
Abstract: PAGE 1.1 Traditional management structure of a project 4 1.2A guide for procurement path 13 1.3 Choosing a procurement path 13 2.1 Alternative CM concepts in USA 25 2.2 Management structure of 'pure' MC in UK 31 2.3 Cumulative number of contractors entering MC market 51 2.4 Percentage of MC by value of projects 55 2.5 Percentage of MC by building type 56 2.6 Percentage of MC by Construction type 56 2.7 Percentage of MC by sectors 56 3.1 The Chosen research model 73 3./ The research methodology sequence 88 4.1 Construction cost plotted against pre-construction time 124 4.2 Construction cost plotted against construction time ... 126 4.3 Construction cost plotted against total project time .. 130 4.4 Construction cost plotted against area / week 134 4.5 Gross floor area against cost / sqm 137 4.6 Construct cost plotted against percentage time overrun 140 4.7 Construct cost plotted against percentage cost overrun 140 4.8 Significant correlations annoted on the research model 151 HST OF TABLES NO.TITLE PAGE 2.1 Advantages of MC (CCMI survey) 45 2.2 Disadvantages of MC (CCMI survey) 47 2.3 Details of surveys conducted to investigate the market development and clients' perception of MC 49 2.4 History of management contractors studied 50 2.5 Procurement method adopted for their turnover by the management contractors identified 52 2.6 Output of management contracting (in 1983 prices) 53 2.7 Responses to questions on MC V traditional method 58 2.8 Attitudes towards MC in the future 612.9 Future trend for MC (CCMI survey) 64 3.1 The research sample, showing procurement method and client characteristics 94 3.2 The research sample, showing procurement method and designer characteristics 95 3.3 The research sample, showing procurement method and project characteristics 96 3.4 The research sample, showing procurement method and contract procedure 99 4.1 Ranking of criteria for project performance 109 4.2 Ranking of a survey of client criteria 111 4.3 Correlation between performance measures and client 113 4.4 Client type and construction time under a MC 114 4.5 Correlation between project performance and designer SUMMARY This research pursues the development of management contractingIn the UK construction industry, and aims to compare it with the traditional method with a view to providing some indication of how both systems may be matched to particular circumstances.A theoretical model was used to assist in comparing project performance in a case study sample of 39 management contracts and 30 traditional form of contracts, and have identified several variables which could influence the performance of a project.The first main hypothesis proposed is:-Management contracting can satisfy clients who need their projects quickly and for projects that are large and/or highly complex'.This led to a second hypothesis, Project performance is a function of the characteristics of the client, the project, the designers, the contract procedure employed and the procurement method adopted for their projects'.
Author: Shamil Naoum
Institution: Brunel University of London
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W140449276
